Tristan's Blog

Sunday, 22 November 2026

Why Is UK Train Wifi Still So Bad?

Our main rail arteries are dead zones, and that is costing us growth. It is a choice, and we can choose differently.

Why Is UK Train Wifi Still So Bad?

The wifi on trains in the UK has long been a joke.

We have two main legs of railway that stretch vertically through the country and up into Scotland: the West Coast and East Coast main lines. Between them they carry millions of people every year.

Trains give you the chance to create rather than consume. Yet for some reason there’s very little appetite to shore up connectivity on these main arteries. For a country that talks about growth constantly, that’s a strange blind spot.

Nobody wants to pay for it

Unlike motorways, railways in the UK often run through land that’s a poor investment for telecoms companies. Not many customers live in a cutting halfway between Preston and Lancaster.

So there’s very little incentive to build the masts you’d need to actually improve the connection on trains.

That works against the push for growth. Passengers sitting by a window, with fields and sunlight going past, are in a great place to think. They just can’t connect, so they can’t make that time work for them.

A moving target

It doesn’t help that trains move. There are tunnels and cuttings, plus congestion where the railway runs alongside a motorway and every car is fighting over the same mast.

Apart from the lucky blips of signal on suburban lines, the technology is genuinely harder too:

  • Carriages are metal boxes. Modern trains often have metallised windows that block a lot of the signal before it ever reaches your phone.
  • Speed makes handovers hard. At 125mph you’re jumping between masts constantly, and every handover is a chance to drop.
  • Faster 5G doesn’t travel far. The higher-frequency 5G bands carry more data but have a shorter range and struggle to get through obstacles. That makes them a worse fit for a fast train in the countryside than the older 3G and 4G bands.

So we either need a huge number of masts along the track, each covering a tiny stretch, or we need to look somewhere else.

Look up

Somewhere else might be the sky.

Low-earth-orbit satellite constellations have changed the maths. Fitting a train with roof-mounted satellite antennas and using that as the backhaul for onboard wifi used to be slow and expensive. Now it’s realistic, and operators are trialling it.

It isn’t a silver bullet. Tunnels and deep cuttings still block the sky, and satellite works best alongside cellular rather than replacing it. But for the long rural stretches where nobody will ever build a mast, it closes a gap that’s been open for decades.

Growth, growth, growth

Every government of the last decade has told us growth is the priority. More growth, more productivity, more entrepreneurship. It’s the mission everything else hangs off.

So it’s worth asking why one of the cheapest growth levers we have is sitting there unpulled.

The productivity problem

UK productivity has barely moved since the financial crisis. Economists have written plenty about why. Under-investment, an economy too centred on the South East, and businesses that can’t get the tools they need all come up again and again.

Bad connectivity on our main rail lines hits all three.

Usually the productivity debate is about getting more out of the same hour. On trains, we’re not even getting the hour. Millions of journeys a year, often two or three hours at a time, turn into time where people can’t do meaningful work. That’s not a rounding error. It’s a huge amount of working time lost to a problem we already know how to fix.

The train is the office now

Hybrid working changed the commute. Plenty of people now go into the office two or three days a week and travel further to do it, because they no longer have to do it five days a week.

That makes the train part of the working day. A Manchester to London journey is a morning of focused work, if the connection holds up. It’s the one place where nobody can pull you into a meeting.

When the connection drops, all of that turns into dead time. You can’t push code, join a call, open a shared doc or reply to the email that would have unblocked someone else. Multiply that across every carriage on every train and it adds up quickly.

Levelling up runs on rails

If we’re serious about growth outside London, the main lines are where it happens. They’re what link our big cities: London, Birmingham, Manchester, Leeds, Newcastle, Glasgow, Edinburgh.

The long, empty rural stretches that telecoms companies don’t want to cover sit right between those cities. They’re the gaps we’re trying to close.

If a two-and-a-half-hour journey is productive, living in the North and working with a business in London (or the other way round) stops being a sacrifice. That spreads talent, spending and investment across the country, which is exactly what levelling up was meant to do.

Ideas don’t wait for a signal

The UK is one of the easiest places in the world to start a business, largely thanks to its online services. You can incorporate a company from your phone in an afternoon.

Unless you’re on a train.

Commutes are exactly when people have a consistent block of time for a new thought, an earworm or an idea. Plenty of side projects, startups, songs and novels get built in those in-between hours. I’ve often looked forward to writing a new feature for a project on a journey, then spent the trip exasperated as every request and idea fails to go anywhere.

That kind of unreliable connection kills the kind of grassroots, small-scale creation that turns into growth later on. The thing you start on the 07:30 to Euston is sometimes the business you’re running five years later.

Making rail win

There’s a quieter growth argument too. Every journey that moves from car or plane to train is good for congestion, for emissions and for the railway’s own finances.

People choose trains partly because they can use the time. Take that away and the train is just a slower, pricier version of the car where you can’t even make a phone call. Reliable connectivity is one of the few improvements that makes the whole network more attractive without laying a single extra mile of track.

Consumption isn’t the enemy, but neither is it the point

I’ll admit there’s an argument that bad signal stops us consuming on trains, and maybe that’s a win. But that isn’t how people behave. When the connection can’t hold up for anything meaningful, people fall back on short-form content to kill the time, because that’s all it can load.

Fix the connection and you don’t just get more scrolling. You give people the choice to do something with the time, whether that’s work, building something, learning or just reading properly.

It’s cheap, relatively

This is the bit that frustrates me most. Compared to the cost of the railway itself, masts, trackside fibre and onboard kit are small change. We spend billions laying track and buying trains, then leave the passengers on them unable to send an email.

If you were designing a growth policy from scratch, you’d struggle to find something with a better return. The track and the trains already exist, and so do the passengers. They just can’t get online.

Some ideas

Make trackside infrastructure neutral. Any connectivity built along the main lines should be neutral-host, meaning it’s open to every mobile network rather than locked to one. We shouldn’t accept contracts where a company lights up a route and keeps everyone else off it.

Tie it to licensing. Ofcom could make operating licences conditional on contributing to a national fund that builds cellular infrastructure alongside major rail links.

This isn’t wild. We’ve auctioned spectrum for 3G, 4G and 5G to the highest bidders, attaching conditions as we went. Adding a condition that funds rail connectivity doesn’t feel far-fetched.

Sell the naming rights. Network Rail could offer a long-term contract to brand a whole line in return for building, maintaining and running its connectivity. The BT West Coast Main Line, say. A single provider gets a commercial reason to care, and passengers get a line that works. It would need to be a long contract to make the investment worthwhile.

HS2

HS2 runs on newer routes through sparser countryside between London and Birmingham, so there will probably be even less existing coverage than on the West Coast Main Line.

That’s an argument for building connectivity in from day one, not bolting it on afterwards. We’ll never have a cheaper moment to put cable and masts next to the track than while we’re laying it.

Why it matters

I’m entirely convinced that trains should be the main way to make long journeys across mainland Europe. The UK should be near the top of that list too. We have few natural disasters, our terrain is manageable, and our major cities are close together.

What’s stopping us is a lack of positive narrative, and a missed opportunity to level up our infrastructure nationwide. If growth really is the mission, a connected railway should be part of it.

HS2 has been a disaster. Shorter legs of high-speed rail between city hubs, planned around passenger numbers, should be the main aim. But trains are hard, and that’s okay.

Connectivity doesn’t have to be.


This post was written on a train. It was proof-read by my own tired eyes… and AI.

← All posts